For my use, the order of the menu choices in the menu are cumbersome and inconvenient.

As a tool for research and accumulation, I never use Reload, Share, or Inspect Element.
In both Chrome and Safari “Open Link in New Tab” is the first item, then "Open Link in New Window. Arguably their research would indicate that is a widely preferred order; I realize your research results could be different.
Is there any way for me to change the order of the menu items?